Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Team 

Lee Braginsky

Profile Picture
User557058:de4eac47-6d4e-4b50-9c3c-4a82ed705e52

Taras Spashchenko

Taras_Spashchenko@epam.com

tshpachenko@ebsco.com

Technical Product Owner
Solution Architect

Profile Picture
User63f10b92af665dfde8927272

ykumar@ebsco.com

Product Owner

Profile Picture
User5ac3364f7ddadd4a9df5cfc0

Oleksandr Haimanov

oleksandr_haimanov@epam.com

ohaimanov@ebsco.com

DevOps  Engineer

Profile Picture
User712020:220504af-4be0-4aeb-8c16-e19b9dc56701

Renat Safiulinrenat_safiulin@epam.comDevOps Engineer

Profile Picture
User557058:003b2b3f-c9ac-4207-96eb-21cdb3765e26

Oleksii Petrenko

oleksii_petrenko1@epam.com

Scrum Master

Profile Picture
User712020:9238adff-3758-4ca6-9bcb-f51dd293c43e

Eldiiar Duishenaliev

eduishenaliev@ebsco.com

eldiiar_duishenaliev@epam.com

DevOps Engineer

Profile Picture
User712020:52f3c401-efc3-438a-a240-2a5ecc54e8d5

arsen_atoyan@epam.com

DevOps Engineer

Profile Picture
User712020:84f7d0a2-6872-4ef0-82fc-fd3503f045a7

dmytro_moroz@epam.com

DevOps Engineer


Team Calendar


calendar
id5c9b23ff-e933-4270-bd59-7f87434b69a2,1135c7b0-fff1-4e48-b7a1-c7084efd9a61,14fea151-932c-4025-b6af-58216d2be391,ecc5f9da-4114-4f38-9b0e-1dc9936f64c1,3d7ab27a-d490-4895-a9d2-8f8a618b054c,fa71ab32-6efa-41f3-a8b4-1f2be7a8fc34

Vacation policy

Folio - Vacation Policy - EBSCO/EBS-CRDI - EPAM Knowledge Base: (broken link, fixing)

  1. Plan your vacation for three months ahead. Only exceptional vacation is acceptable without PO approve.  
    1. Your vacation should not exceed two weeks.  
    2. If you don't know exact dates – just highlight number of days to evaluate Team capacity. 
    3. If during the desired vacation period we have two previously approved vacations of other members of the same team, the vacation may be not approved. It is valid for the team of up to 8 developers, if you have more than 8, it is OK to have tree and more parallel vacations in proportion. The precedence for intersections is defined on FIFO (first in, first out) basis. 
    4. Small deviations are possible (health or family issues) but they should be clarified personally with your SM.
  2. Send Vacation Request to your SM. SMs should check if there are any concerns about the requested dates (overlapping with other vacations in the team, length of vacation, planned releases), clarify vacation dates with POs and if no objections (it does not affect delivery and limitations of the current policy), confirm vacation as approved. For any edge cased - consult with DM. 
  3. After Approval - fill the desirable dates period in corresponding team's calendar in Ebsco Confluence.
  4. Create Vacation Request on vacation.epam.com  and attach email with approval.
  5. Click Leave For Vacation when it will be the first vacation day.
  6. Click Mark Arrived when the vacation is ended. 

Vacations are stored in Kitfox Calendar.

Some other useful info

...