Get Alternate Rolling Renewal Period from Loan Policy (Renew from Current Due Date)

Description

Purpose: The purpose of this story is to calculate the due date for renewals on such loans when an ALTERNATE rolling renewal period has been selected for renewals

Scenarios:

  1. Scenario

    • Given Loan Policy X has:

      • Loanable = Y

      • Renewable = Y

      • Loan profile = Rolling

      • Renewal period different from original loan? = Y

      • Renew from = Current due date

    • When Renewing Loan L from the User Loans or User Loan Details pages

    • Then the Due date for Loan L should be Current loan due date + Alternate loan period for renewals

Out of scope (other stories will be added for these):

Useful links:

Environment

None

Potential Workaround

None

Checklist

hide

TestRail: Results

Activity

Show:

Adam Shire May 14, 2018 at 5:57 PM

tested successfully in folio-snapshot-stable and setting to done.

Done

Details

Assignee

Reporter

Tester Assignee

Priority

Fix versions

TestRail: Cases

Open TestRail: Cases

TestRail: Runs

Open TestRail: Runs
Created March 12, 2018 at 12:42 PM
Updated January 15, 2019 at 3:37 AM
Resolved May 14, 2018 at 5:57 PM
TestRail: Cases
TestRail: Runs

Flag notifications