...
Test | Description | Feature(s) | Status | Product Owner | Testing documents | Target Date | Planned Environment | |||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
ECS Title level requests (with mod-tlr enabled) | The goal of this test is to verify that ECS title level request functionality works as expected. |
|
| Sept 16-20, 2024 | ||||||||||||||||||||||
Mediated requests 1 | The goal of this test is to is to verify the following Mediated requests functionality: Search, Filter, Confirm item arrival, and Send item in transit. |
| Nov 4-8, 2024 | |||||||||||||||||||||||
ECS Item level requests (with mod-tlr enabled) | The goal of this test is to verify that ECS item level request functionality works as expected. |
|
| Oct Nov 4-8, 2024 | Mediated requests 2 | The goal of this test is to verify the following for Mediated requests functionality: create, save, edit, decline, and confirm. | Nov , 2024 | |||||||||||||||||||
ECS Loans part 1 (with mod-tlr enabled) | The goal of this test is to verify that ECS loan functionality works as expected: check in, check out, view loan details, view user details, and view loan transactions in Circulation log. |
|
| Nov 14-20, 2024 | ||||||||||||||||||||||
ECS Loans part 2 (with mod-tlr enabled) | The goal of this test is to verify that ECS loan functionality works as expected: Renew loans, recall items, declare item lost, item aged to lost |
| Nov 14-20, 2024 | |||||||||||||||||||||||
Mediated requests 2 | The goal of this test is to verify the following for Mediated requests functionality: create, save, edit, decline, and confirm. | Dec 3-9, 2024 | ||||||||||||||||||||||||
Private requests | Nov Dec 3-9, 2024 | |||||||||||||||||||||||||
Printing staff slips | Nov Dec , 2024 |
*Note: Target dates in italics are estimates