Meetings are held on Thursdays at 9:30 a.m. Eastern U.S. time (following daylight saving time rules for the Eastern U.S. timezone; see this time in your timezone). Download .ics file to add this meeting to your calendar.
Resource Management SIG organization review - desire to have a fuller discussion? PC previously agreed to return to the topic in September. There are no concerns from Product Council at this point.
CalTech is live on FOLIO (full implementation, coming off of Tind).
Results will be summarized and presented to CC / PC / TC shortly
Introduction of new FOLIO member UB Regensburg (Germany)
Job ads in the FOLIO community: shall be done in a new Slack channel (tbd)
CC decided to keep Zak Burke as a TC member while he is changing the employer. EBSCO has now 2 votes in TC. (The governance model is silent on this point.)
Process of Governance amending was clarified, which includes the alignment between CC, TC and PC
WOLFCon: CC supports a F2F meeting - planning in progress. The venue is requiring payment, and the local planning committee is looking at options. The plans for meeting scheduling will be coming up soon.
FOLIO Quarterly Community meeting scheduled for Friday October 8th - Wiki page will be set up
External Code Submissions and LDP app evaluation: TC drafted technical criteria for code contributions, see FOLIO Module Acceptance Values and Criteria v1.0. (This will be moved to a more permanent location.) These criteria were used to evaluate the LDP UI and its back-end connector module. For both modules there are some criteria that are not met and need remediation, details in MOD-LDP Acceptance Analysis and ui-ldp Acceptance Analysis. This is being communicated back to the LDP devs.. There was much discussion about both the LDP app and the eval process that we are developing, for details see the 2021-09-22 Meeting notes. The largest gaps are in support for multi-tenancy and in some aspects of accessibility, plus where the canonical source code lives. The eval team is drawing up proposed deadlines for specific items. The TC is reviewing the nature of the criteria in an attempt to reduce the subjectivity of the evaluation. What are PC's expectations for this: is the PC looking for a yes/no answer from the TC or a report describing the nature of submission? Also, how strict should the criteria be applied for inclusion in Kiwi? Does the community want a process for apps to have a place that don't go through this process?
Operational and SysOPs needs: Reviewed with SysOps reps the operational concerns they have, similar to what they presented to the PC. Much of this can be characterized as forms of technical debt. There is some question about what TC can do, as TC can look at approaches but does not assign resources. Next actions are unclear. Addressing these probably involves all of CC, PC, and TC.
Check Out Performance: reviewed proposal, determining actions this weekdeferred due to time taken by LDP evaluation.
Discussions about lack of dev resources for Prokopovich (the former "core-functional" team) and setting expectations on work that can be done and if projects need to move. At the end of the year, this team will have the equivalent of 1 back-end and 1 1/2 front-end developers (spread over multiple people). It tends to be a team that works on central apps (Inventory, Circulation, etc). EBSCO intends to contribute two additional developers to the team, but it isn't enough.
Optimistic Locking - Starting with the Inventory app, agreed on requirements and met with MM SIG for validation. Several POs are testing functionality - https://core-platform.ci.folio.org/. So far the testing is progressing well, with some challenges due to the configuration of the testing environment. Still unsure if the feature will be included with Kiwi.
POs met with the Roadmap team to discuss Roadmap themes and the group's goals
Dennis B. has proposed an additional UXPROD workflow status that represents a feature/story that requires additional technical requirements before development can begin.
This Friday (9/24) Kiwi code freeze date for platform complete modules. Core modules code freeze (9/17).