Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. In the Orders app, create an order and order line:
    1. The order should be ongoing (recommended, not required)
    2. Ordering and receiving quantity should be independent (recommended, not required.)
    3. Claim active should be checked/true (this is required.)
    4. When complete, open the order.
  2. In the Organizations app, verify that the selected vendor for the order has an associated claiming integration
    1. Select the organization
    2. Click on "integrations" in the third pane
    3. Expand the "integration details" accordion
    4. If at least one integration exists verify that it is a claiming integration
    5. If no integrations exist, click "add integration" and create a claiming integration:
      1. Make sure integration type is "claiming"
      2. Selecting transmission method "ftp" without a valid ftp server will generate an error when the job is created, but the claim file will be downloadable.
      3. The simplest check will be transmission method "download" and file format "CSV" (recommended).
      4. If using "download" and "CSV", EDI configuration and FTP details can be ignored.
  3. In the Receiving app, create receiving pieces - OR - use the Serials app to generate receiving pieces
    1. The number of pieces doesn't matter, but multiple pieces are recommended for this test.
    2. Once pieces have been created and are "expected", click each piece to enter its detail screen
    3. Use the drop-down next to "Save & close" and select "Mark late"
  4. You may want to repeat steps 1-3 so you have multiple orders from multiple vendors.

Claiming

  1. Open the Claiming app
  2. Verify that all pieces marked "late" appear on the screen

...