Renewal override for multiple items: calculate due date date message does not display

Description

  1. As diku_admin on folio_snapshot

  2. create two loans for a user:

    • loan A with a non-renewable loan policy

    • loan B that has a maximum number of renewals

  3. renew loan B up to maximum number of renewals

  4. renew loan A (for the first time) and loan B (for the maximum number of renewals +1 time) together using bulk actions

  5. when renewal fails, click override

Actual: For each row in the table, the "Select due date above" message displays
Expected: for loan A, the "select due date above" message displays. for loan B, the "due date will be calculated automatically" message displays.

Notes:

  • When I use the datepicker to select a new due date and complete the override, the override does calculate the due date for loan B instead of using the chosen date.

  • Screenshots are attached of bug (with different error for loan A) and of correct behavior when there is only one loan in the bulk renewal.

CSP Request Details

None

CSP Rejection Details

None

Potential Workaround

None

Attachments

2

Checklist

hide

TestRail: Results

Activity

Show:
Done

Details

Assignee

Reporter

Tester Assignee

Priority

Story Points

Sprint

Development Team

Vega

Fix versions

TestRail: Cases

Open TestRail: Cases

TestRail: Runs

Open TestRail: Runs
Created August 23, 2019 at 8:28 PM
Updated September 23, 2019 at 3:37 PM
Resolved September 19, 2019 at 11:15 PM
TestRail: Cases
TestRail: Runs