JIRA StatusDescriptionAssignee/Actions
DraftPO is defining the user story. Not ready for the team to review.

Assignee: PO (or Back-end Lead for back-end stories)

  • Requirements to be finalized and added to story/bug
  • Story/bug to be updated according to the templates
In RefinementReady for grooming

Assignee: None

  • Issue is better defined and ready for the development team to review and to estimate issue.  
  • Story/bug to be reviewed and discussed on Backlog Grooming
  • Requirements to be clarified
  • Acceptance criteria to be understood
  • Estimation to be added
OpenReady for development 

Assignee: None

  • Story/bug to be taken into development
In ProgressDevelopment is in progress

Assignee: Developer

  • Requirements to be turned into working software
  • Acceptance criteria to be met 
  • Tests to be added/updated to ensure 80% coverage
  • Dev verification to be done
  • Critical defects to be addressed
BlockedDevelopment is blocked

Assignee: Developer/PO

  • Blocker to be linked in JIRA via "is blocked by" (if any)
  • Comment to be added to clarify what the blocker is (in case there is no blocking story)
In Code ReviewPR is done and Code Review is in progress

Assignee: Developer

  • PR to be reviewed by other developers
  • Comments to be addressed
  • 2 approves of a PR are preferable
  • PR to be merged
In ReviewPR is merged and updates are ready for review

Assignee: Developer

  • Updates to be deployed to http://folio-snapshot-stable.aws.indexdata.com/ and confirmed as available there
  • Comment to be added to clarify and confirm implementation (screenshots are highly welcomed)
  • Story/bug to be reassigned to PO for final verification or unassigned in case of BE stories

Assignee: PO or Unassigned/Developer (for back-end stories)

  • Story/Bug to be checked on http://folio-snapshot-stable.aws.indexdata.com
    • UI stories are checked and accepted by PO
    • BE stories checked and accepted by any available developer and should be assigned to a dev as soon as they are picked up for final verification and acceptance.
  • Story to be closed if requirements are met and it conforms to the definition of done
  • Story to be reassigned back to developer (implementer) In Progress in case the requirements are not met
  • Additional stories to be created in case additional requirements/updates are identified while review
Awaiting release

Applicable for the fixes to be included into Bugfix or Hotfix releases.

Fix is ready to be included into Bugfix or Hotfix release.

Assignee: Developer

  • Fix was tested and accepted by PO on testing/snapshot env 
  • Fix is waiting to be included into Bugfix or Hotfix release
Awaiting deployment

Applicable for the fixes to be included into Bugfix or Hotfix releases.

Fix is included into Bugfix or Hotfix release and is waiting to be deployed to corresponding BugFest env.

Assignee: Developer

  • Fix was included into a Bugfix or Hotfix release
  • Release was announced in Slack
  • Corresponding release tasks (linked to the fix) was closed
  • Status was updated to Awaiting deployment by SM upon release announcement
In Bugfix Review

Applicable for the fixes to be included into Bugfix or Hotfix releases.

Fix is deployed to corresponding BugFest env in scope of a Bugfix or Hotfix release.

Assignee: Developer/PO

  • Fix was deployed to a corresponding BugFest env as a part of a Bugfix or Hotfix release
  • Status was updated to In Bugfest Review by AntonE
  • Fix is to be tested by PO/Developer on Bugfest env to confirm it is working as expected
ClosedStory is accepted by PO and closed

Assignee: PO (or Back-end Lead for back-end stories)

  • Updates can be demonstrated on System Demo