Skip to end of banner
Go to start of banner

Poppy

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

Document StatusDraft
Document Version1
Last TC Review Date

 

Last TC Review OutcomeDocument incomplete


  Draft Draft Draft  Draft Draft Draft  Draft Draft Draft  Draft Draft Draft  Draft Draft Draft  Draft Draft Draft  Draft Draft Draft  Draft Draft Draft 

Frontend

Frameworks

  • React ^17.0.2
  • Stripes ^7.1.0

Build tools

Unit test stack

  • Jest ^26.6.3
  • RTL ^12.1.2

End-to-end test stack

  • Cypress ^9.1.1

Backend

Languages

Frameworks

Build tools

  • Maven 3.8 or later
  • JDK 11 or 17 (migration instructions: JDK 17 and Java 17); Java 17 is required by the Spring versions listed above
  • Docker
  • Gradle

Unit test stack / Build-time integration test stack

  • JUnit 4 or 5
  • rest-assured 
  • testcontainers 

Integration test stack

  • karate 
  • cucumber-reporting

Infrastructure


Support period

Technology versions must support the full Poppy support period that ends around March 2024: Puppy will be released around August 2023 and will be supported until Rocket gets released around March 2024 (based upon assumption that future releases will follow a similar cadence to previous releases), see FOLIO support policy.

  • No labels