Skip to end of banner
Go to start of banner

Firebird - Jira Flow

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

JIRA StatusDescriptionAssignee/Actions
DraftPO is defining the user story. Not ready for the team to review.

Assignee: PO (or Back-end Lead for back-end stories)

  • Requirements to be finalized and added to story/bug
  • Story/bug to be updated according to the templates
OpenReady for development team to groom.

Assignee: None

  • Story/bug to be reviewed and discussed on Backlog Grooming
  • Requirements to be clarified
  • Acceptance criteria to be understood
  • Estimation to be added
In ProgressDevelopment is in progress

Assignee: Developer

  • Requirements to be turned into working software
  • Acceptance criteria to be met 
  • Tests to be added/updated to ensure 80% coverage
  • Dev verification to be done
  • Critical defects to be addressed
BlockedDevelopment is blocked

Assignee: Developer/PO

  • Blocker to be linked in JIRA via "is blocked by" (if any)
  • Comment to be added to clarify what the blocker is (in case there is no blocking story)
In Code ReviewPR is done and Code Review is in progress

Assignee: Developer

  • PR to be reviewed by other developers
  • Comments to be addressed
  • 2 approves of a PR are preferable
  • PR to be merged
In ReviewPR is merged and updates are ready for review

Assignee: Developer

Assignee: PO (or Back-end Lead for back-end stories)

  • Story/Bug to be checked on http://folio-snapshot-stable.aws.indexdata.com
    • Back-end Story/Bug: the API Tests should be run from master branch or a branch with prepared PR to make sure no regression introduced and new tests meet Acceptance Criteria. If all is okay, the PR is approved and merged to master.
  • Story to be closed if requirements are met and it conforms to the definition of done.
  • Story to be reassigned back to developer In Progress in case the requirements are not met with a comment.
  • Additional stories to be created in case additional requirements/updates are identified while review.
ClosedStory is accepted by PO and closed

Assignee: PO (or Back-end Lead for back-end stories)

  • Updates can be demonstrated on System Demo
  • No labels