Probability

Risk exposureColorRisk priority

0.050.250.50.750.950 - 0.75GreenLow risk

I

M

P

A

C

T

10.050.250.50.750.950.95 – 2.25AmberModerate risk
20.10.0.511.51.92.5 – 4.75RedCritical risk
30.150.751.52.252.85

Prioritization of risks must be done based on Risk Exposure value as follows:

  • If Risk Exposure value is Green (i.e. for Low Risks) Mitigation Plan or Contingency Plan are not obligatory.
  • If Risk Exposure value is Amber (i.e. for Moderate Risks) Mitigation Plan is required, Contingency Plan could be developed but is not obligatory.
  • If Risk Exposure Value is Red (i.e. for Critical Risks) Both Mitigation and Contingency Plans are required.
40.21233.8
50.251.252.53.754.75

Image Added


Risk category

Risk sourceRisk Description/SummaryRisk ProbabilityRisk ImpactRisk ExposureRisk Exposure

Risk status

(open/treated)

Risk Treatment Strategy

(avoidance/

reduction)

Last Update dateMitigation Plan
(Treatment strategy description)
AssigneeDate of Risk OccurrenceIssue Status Contingency PlanContingency Plan Assignee
































































































































...