Details
Assignee
Maksym SinichenkoMaksym SinichenkoReporter
Daria ReznikovaDaria ReznikovaPriority
P2Development Team
EBSCO - FSERCA Group
TBDTestRail: Cases
Open TestRail: CasesTestRail: Runs
Open TestRail: Runs
Details
Details
Assignee
Maksym Sinichenko
Maksym SinichenkoReporter
Daria Reznikova
Daria ReznikovaPriority
Development Team
EBSCO - FSE
RCA Group
TBD
TestRail: Cases
Open TestRail: Cases
TestRail: Runs
Open TestRail: Runs
Created 5 days ago
Updated 20 hours ago
Not reproducible every time.
Preconditions:
User is logged into eureka-bugfest ECS https://bugfest-sunflower-consortium.int.aws.folio.org/ as an admin user in College tenant
Active vendor organization has been created and has active account number.
Organization has two created integrations with the following integration details:
Integration #1:
Integration name - any unique value
Integration type - Claiming
Transmission method - FTP
File format - CSV
EDI FTP - FTP
FTP mode - ASCII
Server address - ftp://ftp.ci.folio.org
FTP connection mode - Active
Username - folio
Password - Ffx29%pu
FTP port - 22
Order directory - /files
Integration #2:
Integration name - any unique value
Integration type - Claiming
Transmission method - FTP
File format - EDI
Account number - existing active account
Vendor EDI code - any value
Library EDI code - any value
EDI FTP - FTP
FTP mode - ASCII
Server address - ftp://ftp.ci.folio.org
FTP connection mode - Active
Username - folio
Password - Ffx29%pu
FTP port - 22
Order directory - /files
An Order associated with created vendor Organization in "Open" status with PO lines has been created with the following PO line settings:
"Claiming active" option is active (checked)
"Claiming interval" - 1
"Receiving workflow" is "Synchronized order and receipt quantity"
"Quantity" - 2
"Create inventory" is "Instance, Holding, Item"
Pieces related to Order were marked as “Late” in the receiving app
Steps to reproduce:
Go to “Claiming” app
Check checkboxes next to both pieces from preconditions
Click "Actions" button → Select "Send claim" option → Specify any date in the future in the appeared "Send claim" modal → Click “Save&close” button
Go to “Export manager” app → Select "Organization" toggle on the "Search & filter" pane → Check "Claims" checkbox in the "Integration type" facet
Expected results:
Claiming job from preconditions is displayed in “Successful" status. EDI and CSV files are downloaded via FTP connection.
Actual results:
Blank EDI and CSV files are downloaded via FTP connection. Claiming job from preconditions is displayed in “Failed” status. Error details: File upload failed. 425 Security: Bad IP connecting. (FtpException).