Mark for deletion or Resume using? Vega - Risks list

Mark for deletion or Resume using? Vega - Risks list

Risk probability



Risk impact

Probability level

Description

Value

Impact value

Impact description

Value

Very low

In past projects experience you have never seen this happen, but it probably could

0.05

Very Low

Small monetary loss or a few days of delay

1

Low

It has happened on occasion

0.25

Low

Manageable monetary loss or a few weeks of delay

2

Moderate

Sometimes it happens and sometimes not

0.5

Moderate

Heavy monetary loss or significant delay that doesn't endanger project success in general

3

High

Most of the time this event happens

0.75

High

A loss or a delay that can endanger overall project success

4

Very high

It has happened on almost every project and you think it always will but there is a chance of escape

0.95

Very high

Project failure and possible additional losses

5

Risk Exposure

Risk exposure value is calculated by the given formula:

Risk Exposure Value = Risk Probability * Risk Impact

The following table provides the possible exposure values:


Probability



Risk exposure

Color

Risk priority



0.05

0.25

0.5

0.75

0.95

0 - 0.75

Green

Low risk

I

M

P

A

C

T

1

0.05

0.25

0.5

0.75

0.95

0.95 – 2.25

Amber

Moderate risk

2

0.1

0.0.5

1

1.5

1.9

2.5 – 4.75

Red

Critical risk

3

0.15

0.75

1.5

2.25

2.85

Prioritization of risks must be done based on Risk Exposure value as follows:

  • If Risk Exposure value is Green (i.e. for Low Risks) Mitigation Plan or Contingency Plan are not obligatory.

  • If Risk Exposure value is Amber (i.e. for Moderate Risks) Mitigation Plan is required, Contingency Plan could be developed but is not obligatory.

  • If Risk Exposure Value is Red (i.e. for Critical Risks) Both Mitigation and Contingency Plans are required.

4

0.2

1

2

3

3.8

5

0.25

1.25

2.5

3.75

4.75

Risk category

Risk source

Risk Description/Summary

Risk Probability

Risk Impact

Risk Exposure

Risk Exposure

Risk status

(open/treated)

Risk Treatment Strategy

(avoidance/

reduction)

Last Update date

Mitigation Plan
(Treatment strategy description)

Assignee

Date of Risk Occurrence

Issue Status

 Contingency Plan

Contingency Plan Assignee

Risk category

Risk source

Risk Description/Summary

Risk Probability

Risk Impact

Risk Exposure

Risk Exposure

Risk status

(open/treated)

Risk Treatment Strategy

(avoidance/

reduction)

Last Update date

Mitigation Plan
(Treatment strategy description)

Assignee

Date of Risk Occurrence

Issue Status

 Contingency Plan

Contingency Plan Assignee