2020-07-01 ERM Weekly Delivery Update

2020-07-01 ERM Weekly Delivery Update

Meeting Details

Date

Jul 1, 2020 

Time

09:30am ET, 2:30pm UK, 3:30pm Germany

Location

Video Call in FOLIO Slack: #erm-developers

Goals

Participants

  • @Jag Goraya

  • @Peter Böhm

  • @Ethan Freestone

  • @Aditya matukumalli

  • @Claudia Malzer

  • @Owen Stephens

  • @Ian Ibbotson (Use this one)

Apologies

Discussion items

 

Time

Item

Notes

Action Items

Time

Item

Notes

Action Items

<5 mins

Introductions

 

30 mins

WIP Updates

Code Review: 

In Progress 

  • https://folio-org.atlassian.net/browse/ERM-950

    • App is done

    • Tests begun

    • Weird issue re filters: 

      • not showing up in URL

      • Tests seem to block test writing

    • Standalone works

    • Running without ui-agreements runs fine, introducing it causes the filters to not display

    • Two filters with different names = shouldn't be an issue

    • Filters call the plugins, which each call mod-agreements

      • potentially caching some ui-agreements

    • Set up as with other 

    • datakey is being passed in, though needs to be unique

      • may be the same that's being passed in on both filters. 

    • needs a separate endpoint which will be used by ERM-951

  • https://folio-org.atlassian.net/browse/ERM-951

    • depends on backend of ERM-950 being merged

    • however there is a PR build failrure because of 

    • JSON structure is not confirmed to be being returned

    • has some dummy data being passed to MCL resembling ERM-953 wireframes

    • frontend work required: 

      • need callback properties in MCL 

      • awaiting shape from ERM-959: added sample during call

    • assume it is data.endpoint

    • will need a STCOM PR 

      • probably ready today

    • will continue to work off Ethan's branch locally

Sprint Backlog

Needs Elaboration

  • NA

QA / UAT: 

 

10 mins

New Issues

Raised / to bring into sprint: NA

Raised: 

  • https://folio-org.atlassian.net/browse/ERM-976 

    • raised as mitigation for ERM-974 and ERM-975

    • brings into line with similar user feedback behaviour introduced for PO lines

    • not required for Goldenrod

    • should be available for Ready to Progress 

 

<15 mins

AOB

NA