|
Issue links:
|
Defines
|
|
defines
|
UXPROD-47
|
Batch Importer (Bib/Acq)
|
Analysis Complete
|
|
is defined by
|
MODSOURMAN-183
|
Running job preview shows invalid data
|
Closed
|
|
is defined by
|
UIDATIMP-311
|
Add preview action to choose jobs screen
|
Blocked
|
|
| Potential Workaround: |
preview by running load in test environment -- Laura W
|
| Release: |
Sunflower (R3 2024)
|
| Epic Link: |
Batch Importer (Bib/Acq)
|
| Analysis Estimate: |
Large < 10 days
|
| Analysis Estimator: |
Niels Erik Nielsen
|
| Front End Estimate: |
Large < 10 days
|
| Front End Estimator: |
Niels Erik Nielsen
|
| Front-End Confidence factor: |
Low
|
| Back End Estimate: |
XXL < 30 days
|
| Back End Estimator: |
Niels Erik Nielsen
|
| Estimation Notes and Assumptions: |
It's not clear if any analysis work has been done already, but a sound estimate would definitely need such an analysis, including thorough considerations about possible technical solutions.
Given the time constraint, the immediate estimates here are not based on any such serious analysis of the two requirements, so confidence is low.
|
| Development Team: |
Folijet
|
| Kiwi Planning Points (DO NOT CHANGE): |
31
|
| PO Rank: |
84
|
| PO Ranking Note: |
From MM SIG convo: if cannot preview not the whole file, would be helpful to have rollback ranked higher (UXPROD-1383)
|
| Rank: Chalmers (Impl Aut 2019): |
R3
|
| Rank: Chicago (MVP Sum 2020): |
R1
|
| Rank: Cornell (Full Sum 2021): |
R4
|
| Rank: Duke (Full Sum 2021): |
R1
|
| Rank: 5Colleges (Full Jul 2021): |
R4
|
| Rank: FLO (MVP Sum 2020): |
R1
|
| Rank: GBV (MVP Sum 2020): |
R1
|
| Rank: Grand Valley (Full Sum 2021): |
R4
|
| Rank: hbz (TBD): |
R1
|
| Rank: Hungary (MVP End 2020): |
R1
|
| Rank: Lehigh (MVP Summer 2020): |
R2
|
| Rank: Leipzig (Full TBD): |
R1
|
| Rank: Leipzig (ERM Aut 2019): |
R4
|
| Rank: MO State (MVP June 2020): |
R2
|
| Rank: TAMU (MVP Jan 2021): |
R1
|
| Rank: U of AL (MVP Oct 2020): |
R4
|