|
Issue links:
|
Defines
|
|
defines
|
UXPROD-47
|
Batch Importer (Bib/Acq)
|
Analysis Complete
|
Relates
|
|
relates to
|
UXPROD-3699
|
Records transmitted to FOLIO from GOB...
|
Draft
|
|
| Release: |
Not Scheduled
|
| Epic Link: |
Batch Importer (Bib/Acq)
|
| Analysis Estimate: |
Medium < 5 days
|
| Analysis Estimator: |
Niels Erik Nielsen
|
| Front End Estimate: |
XXL < 30 days
|
| Front End Estimator: |
Niels Erik Nielsen
|
| Front-End Confidence factor: |
Low
|
| Back End Estimate: |
XXL < 30 days
|
| Back End Estimator: |
Niels Erik Nielsen
|
| Estimation Notes and Assumptions: |
In terms of possible implementations this is still a very open ended requirement. I don't immediately know if any analysis have been made already of the detailed requirements or of potential technical solutions for implementing such a scheduler.
Due to the time constraint, no effort has been done on part of the estimator at least, to consider possible technical solutions and designs for the broader requirement. Confidence is thus set to low.
|
| Development Team: |
Folijet
|
| Kiwi Planning Points (DO NOT CHANGE): |
10
|
| PO Rank: |
65
|
| Rank: Chalmers (Impl Aut 2019): |
R4
|
| Rank: Chicago (MVP Sum 2020): |
R4
|
| Rank: Cornell (Full Sum 2021): |
R4
|
| Rank: Duke (Full Sum 2021): |
R2
|
| Rank: 5Colleges (Full Jul 2021): |
R4
|
| Rank: FLO (MVP Sum 2020): |
R4
|
| Rank: GBV (MVP Sum 2020): |
R2
|
| Rank: Grand Valley (Full Sum 2021): |
R2
|
| Rank: hbz (TBD): |
R2
|
| Rank: Hungary (MVP End 2020): |
R1
|
| Rank: Lehigh (MVP Summer 2020): |
R4
|
| Rank: Leipzig (Full TBD): |
R1
|
| Rank: Leipzig (ERM Aut 2019): |
R4
|
| Rank: MO State (MVP June 2020): |
R2
|
| Rank: TAMU (MVP Jan 2021): |
R2
|
| Rank: U of AL (MVP Oct 2020): |
R4
|