| Fix versions: | Q1 2020 | Parent: | Course Reserves |
| Type: | New Feature | Priority: | P2 |
| Reporter: | Anya | Assignee: | Kelly Drake |
| Resolution: | Done | Votes: | 0 |
| Labels: | courses, po-mvp, q4-2019-spillover, team-mvp | ||
| Remaining Estimate: | Not Specified | ||
| Time Spent: | Not Specified | ||
| Original estimate: | Not Specified | ||
| Issue links: |
|
||||||||||||||||||||||||
| Epic Link: | Course Reserves | ||||||||||||||||||||||||
| Front End Estimate: | Small < 3 days | ||||||||||||||||||||||||
| Front End Estimator: | Mike Taylor | ||||||||||||||||||||||||
| Back End Estimator: | Kurt Nordstrom | ||||||||||||||||||||||||
| Development Team: | Thor | ||||||||||||||||||||||||
| PO Rank: | 80.6 | ||||||||||||||||||||||||
| Rank: Chalmers (Impl Aut 2019): | R5 | ||||||||||||||||||||||||
| Rank: Chicago (MVP Sum 2020): | R5 | ||||||||||||||||||||||||
| Rank: Cornell (Full Sum 2021): | R4 | ||||||||||||||||||||||||
| Rank: Duke (Full Sum 2021): | R1 | ||||||||||||||||||||||||
| Rank: 5Colleges (Full Jul 2021): | R1 | ||||||||||||||||||||||||
| Rank: FLO (MVP Sum 2020): | R1 | ||||||||||||||||||||||||
| Rank: GBV (MVP Sum 2020): | R2 | ||||||||||||||||||||||||
| Rank: hbz (TBD): | R2 | ||||||||||||||||||||||||
| Rank: Hungary (MVP End 2020): | R1 | ||||||||||||||||||||||||
| Rank: Lehigh (MVP Summer 2020): | R2 | ||||||||||||||||||||||||
| Rank: Leipzig (Full TBD): | R2 | ||||||||||||||||||||||||
| Rank: Leipzig (ERM Aut 2019): | R5 | ||||||||||||||||||||||||
| Rank: MO State (MVP June 2020): | R1 | ||||||||||||||||||||||||
| Rank: TAMU (MVP Jan 2021): | R1 | ||||||||||||||||||||||||
| Rank: U of AL (MVP Oct 2020): | R1 | ||||||||||||||||||||||||
| Description |
|
Library staff associate terms, with their start and end dates,to a course for the following reasons: (There is no explicit “state” field (“pending”, “active”, “past”) associated with a term: instead, the current state of a term can be determined when needed based on the current date, and “state” searching can be implemented as a date search based on the current date.) This section includes a “Select term” box, that is prepopulated with Terms (configured in the Course Reserves Settings) and their associated “Start date” and “End date” fields. Having selected the correct term in the “Term” box, users can edit the prefigured start and end dates prior to selecting the enter button. Users with appropriate permissions may change the Term, start and end dates in Settings. The Active status is a checkbox _-------2018 Course Reserves ----- The scheduling of a course in FOLIO There needs to be a drop down to assign a controlled vocab ( summer, winter, fall, spring, or Q1, Q2 etc) Term. Those terms like the Fix date loan rule have an assigned lengh of time associated with them that was pre-entered. Then if the admin needs to change the dates they also have the ability to override the dates see po created mock up: https://folio-org.atlassian.net/wiki/x/jR8i The future date should have the status of Pending |
| Comments |
| Comment by Cate Boerema (Inactive) [ 30/Jul/18 ] |
|
Anya it looks like you didn't get a backend estimate on this. Can you please follow up with Jakub Skoczen to get one (per the Dev leads by area doc, he is the backend lead for this project): https://docs.google.com/spreadsheets/d/1SktTRFLXckqszKOcFJZdEFLRcXUEDHS_8RvIp_Jjpxc/edit#gid=0 |
| Comment by Anya [ 30/Jul/18 ] |
|
Jakub Skoczen- would you please provide backend estimates on this - on the other UXProd-622, and UXprod-628 you estimated medium |
| Comment by Cate Boerema (Inactive) [ 07/Nov/18 ] |
|
Anya, I don't see any stories linked to this feature, but I am pretty sure you said the backlog was complete. Can you please link this up and mark it Analysis Complete? Thanks! |
| Comment by Anya [ 29/Mar/19 ] |
|
Comment from March Meeting: Hkaplanian and Anya to Make a Plan |
| Comment by Holly Mistlebauer [ 23/Sep/19 ] |
|
Holly changed the Fix Version from Q3 2020 to Q4 2019. Features with a Label of cap-mvp must be scheduled for Q4 2019 at the latest. |