Metadata Record Export
(UXPROD-652)
|
|
| Status: | Draft |
| Project: | UX Product |
| Components: | None |
| Affects versions: | None |
| Fix versions: | Sunflower (R3 2024) | Parent: | Metadata Record Export |
| Type: | New Feature | Priority: | P2 |
| Reporter: | Magda Zacharska | Assignee: | Magda Zacharska |
| Resolution: | Unresolved | Votes: | 0 |
| Labels: | LC4, data-export-needs-ranking, export, inventory, loc, metadatamanagement | ||
| Remaining Estimate: | Not Specified | ||
| Time Spent: | Not Specified | ||
| Original estimate: | Not Specified | ||
| Attachments: |
|
||||||||||||||||
| Issue links: |
|
||||||||||||||||
| Release: | Sunflower (R3 2024) | ||||||||||||||||
| Epic Link: | Metadata Record Export | ||||||||||||||||
| Front End Estimate: | XXL < 30 days | ||||||||||||||||
| Front End Estimator: | Magda Zacharska | ||||||||||||||||
| Front-End Confidence factor: | 20% | ||||||||||||||||
| Back End Estimate: | XXXL: 30-45 days | ||||||||||||||||
| Back End Estimator: | Magda Zacharska | ||||||||||||||||
| Back-End Confidence factor: | 20% | ||||||||||||||||
| Development Team: | Firebird | ||||||||||||||||
| PO Rank: | 70 | ||||||||||||||||
| Rank: Chicago (MVP Sum 2020): | R3 | ||||||||||||||||
| Rank: Cornell (Full Sum 2021): | R4 | ||||||||||||||||
| Rank: Duke (Full Sum 2021): | R1 | ||||||||||||||||
| Rank: 5Colleges (Full Jul 2021): | R4 | ||||||||||||||||
| Rank: GBV (MVP Sum 2020): | R4 | ||||||||||||||||
| Rank: Grand Valley (Full Sum 2021): | R2 | ||||||||||||||||
| Rank: MO State (MVP June 2020): | R2 | ||||||||||||||||
| Rank: TAMU (MVP Jan 2021): | R2 | ||||||||||||||||
| Rank: U of AL (MVP Oct 2020): | R3 | ||||||||||||||||
| Description |
|
When the export job starts, the Running jobs component shows details of the job until it is completed and displayed in the completed job logs. For larger jobs that will take take longer to complete we will need to give the user the option to pause running jobs or if it the job is paused, resume it. While the jobs run in order to give the user a visual representation of the current progress, the progress bar should be displayed showing the percentage of completed job. Additional information: During the meeting with Data Export MM SIG subgroup on August 27, 2020, it was discussed how should we log the details of records counts (exported and errors) when the job gets cancelled or paused. It was proposed that for the cancelled jobs the status should be Cancelled, for paused should be Paused. The record and error count should reflect the status of the export when the cancellation or pausing of the job occurred. |
| Comments |
| Comment by Magda Zacharska [ 23/May/23 ] |
|
Adding LC3 label based on prioritization during the LCAP MM meeting on May 17, 2023 |