Export Manager - logs details

Description

There are three elements of this functionality:

1. Landing page - Logs container
This functionality has been mostly implemented but will need to support a scenario when the export generates multiple files, with each file name being a link to the generated file. When user clicks each file name the files are downloaded.

2. View All option
This will display a new form that will contain list of all jobs. How long the logs are being preserved will be determined by tenant level settings. The jobs will be searchable by ID, generated file name, date of execution, job profile and name of the user who triggered the job.

3. Detailed log
This will be accessible by clicking the whole row of listed jobs on the landing page (for recently completed jobs) and View All form. The log will contain a list of all records that were exported (successful and failed) in their designated format. User should be able to filter by successful/failed records. Failure should be displayed in with details (missing or invalid data, for example). The initial implementation could be similar (if not identical) with data import detail log (see attached screenshot)

Priority

Fix versions

Development Team

Concorde

Assignee

Solution Architect

Parent Field Value

None

Parent Status

None

Attachments

3

defines

Checklist

hide

TestRail: Results

Activity

Show:

Magda ZacharskaMarch 20, 2020 at 1:14 PM

only error in detailed log

Done

Details

Reporter

PO Rank

115

PO Ranking Note

This feature will allow user to see the details of the data export job and is crucial for troubleshooting

Front End Estimate

XL < 15 days

Front End Estimator

Front-End Confidence factor

Medium

Back End Estimate

Large < 10 days

Back End Estimator

Rank: FLO (MVP Sum 2020)

R1

Rank: 5Colleges (Full Jul 2021)

R1

Rank: Cornell (Full Sum 2021)

R1

Rank: GBV (MVP Sum 2020)

R1

Rank: hbz (TBD)

R1

Rank: TAMU (MVP Jan 2021)

R1

Rank: Chicago (MVP Sum 2020)

R1

Rank: MO State (MVP June 2020)

R1

Rank: Lehigh (MVP Summer 2020)

R1

TestRail: Cases

Open TestRail: Cases

TestRail: Runs

Open TestRail: Runs

Created March 17, 2020 at 9:29 PM
Updated September 16, 2021 at 5:16 PM
Resolved October 19, 2020 at 6:49 PM
TestRail: Cases
TestRail: Runs